Sunny Shutter Inc. / Education projects

Classroom Door
Vision Panel Cover

A made-to-measure fabric cover for interior school door glazing.

The cover stays above the glass during normal use. Staff lower it by hand when school procedures call for temporary visual screening, then secure it above the glass again afterwards.

Cover positionsRoom-side view
Two black straps hold the fabric cover above the clear door glass.
01 / StowedGlazing remains clear
The black fabric cover hangs over the door glass with the lever clear.
02 / DeployedFabric screens the glazing
Manual and cord-free
Two retaining straps release by hand
Surface-applied mounting
Self-adhesive strip on a compatible door finish
Made to measure
Minimum 2 in (50 mm) beyond each glass edge

01 / Construction & operation

How the cover is built

The black fabric panel has stitched hems, a sewn-in care label and a weighted lower edge that helps it hang flat. Photos show details of a Sunny Shutter product sample.

Head fastening strip and stitched retaining straps on a black fabric sample
Head fasteningA sewn hook-and-loop strip mates with the self-adhesive strip on the door.
Two black retaining straps with light-coloured hook-and-loop tabs
Retaining strapsTwo fabric straps hold the cover above the glazing when stowed.
Two light-coloured receiving patches sewn to the opposite face of the black cover
Receiving patchesMatching patches on the opposite face secure the strap ends.
  1. Stow

    Fasten both straps to hold the fabric above the glazing.

  2. Deploy

    Release both straps by hand and lower the fabric over the glass.

  3. Check

    Check that the fabric hangs flat and overlaps all four edges.

  4. Reset

    Gather the fabric above the glass and refasten both straps.

02 / Specifications & sizing

Product and installation details

Application
Interior classroom door vision panels and designated interior glazing.
Fabric
Flexible black fabric. The quotation identifies the selected fabric.
Operation
Manual, with no roller mechanism or operating cords. Nominal handle length 12 in (305 mm).
Mounting
Surface-applied hook-and-loop fastening. No drilling or screws. Verify adhesive compatibility with the door finish.
Care
Follow the sewn-in label and fabric supplier’s guidance. Inspect straps, fasteners, seams and the weighted hem regularly.
Indicative lead time
About 2–4 weeks for manufacture after measurements and order details are confirmed, plus about 1 week for delivery. Confirm timing for your project.
Warranty
Written product-specific terms are provided with the quotation or contract documents.

Check each opening before fabrication

  • Verify mounting area and overlap, the door finish and adhesive compatibility.
  • Check door swing, nearby hardware and signage, and applicable sightline requirements.
  • Coordinate suitability for any fire-rated door assembly with the project team before installation.

03 / Documentation

Fabric fire-performance documentation

Request available documentation for the fabric proposed for your order. If the tender specifies CAN/ULC-S109, include the required edition and submission criteria with your inquiry.

Lab results apply only to the tested fabric sample. Sunny Shutter makes no fire-resistance rating claim for the assembled cover, its fasteners or the door assembly.

04 / Tender inquiry

Request a project quotation

Send Sunny Shutter your door schedule and the relevant tender pages. Include the project location and bid deadline so we can confirm pricing, timing and the documentation available for your project.

Include with your inquiry

  • Opening references, quantities and clear glass width × height for each opening.
  • Door and frame finish, nearby hardware and any rated-door requirements.
  • Fabric test standard, edition and required submittals, where specified.
  • Bid deadline, desired delivery date and supply or installation scope.